When a project manager divides a system into components in OOSAD,each component is called a(n) :
A) piece of the pie
B) horizontal slice
C) vertical slice
D) node
Correct Answer:
Verified
Q102: What would be the estimated time for
Q103: In OOSAD,one outcome of defining the overall
Q104: Realistic time is:
A)the maximum period of time
Q105: What would be the estimated time for
Q106: In OOSAD,each project iteration has all of
Q108: Slack time is equal to:
A)the difference between
Q109: Which of the following is a true
Q110: In OOSAD,iterations are normally:
A)five weeks
B)ten weeks
C)eleven weeks
D)two
Q111: What would be the estimated time for
Q112: A critical path is:
A)a sequence of activities