In OOSAD,iterations are normally:
A) five weeks
B) ten weeks
C) eleven weeks
D) two to eight weeks
Correct Answer:
Verified
Q105: What would be the estimated time for
Q106: In OOSAD,each project iteration has all of
Q107: When a project manager divides a system
Q108: Slack time is equal to:
A)the difference between
Q109: Which of the following is a true
Q111: What would be the estimated time for
Q112: A critical path is:
A)a sequence of activities
Q113: Optimistic time is:
A)the maximum period of time
Q114: Pessimistic time is:
A)the maximum period of time
Q115: Which of the following is true regarding