If a QRA has been prepared for a process unit, the analysis can borrow extensively from this effort.
A) RBI consequence
B) RBI likelihood
C) RBI probability
Correct Answer:
Verified
Q115: _ refers to a prescriptive methodology that
Q116: The suitability and current condition of the
Q117: If the probability and consequence combination (risk)
Q118: Probability of failure analysis is made from
A)
Q119: In the event of a leak the
Q121: In RBI program discrimination between equipment items
Q122: No deterioration found in the inspection program
Q123: Consequence side of the risk equation is
Q124: In general, the probability of failure is
Q125: Effective inspection program can be derived for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents