Consequence side of the risk equation is normally managed by
A) Inspection alone
B) Process safety personnel
C) Management
D) B&C
Correct Answer:
Verified
Q118: Probability of failure analysis is made from
A)
Q119: In the event of a leak the
Q120: If a QRA has been prepared for
Q121: In RBI program discrimination between equipment items
Q122: No deterioration found in the inspection program
Q124: In general, the probability of failure is
Q125: Effective inspection program can be derived for
Q126: In RBI most of the probability assessment
Q127: Deterioration susceptibility and rate can be done
A)
Q128: If the material of construction and internal/external