Effective inspection program can be derived for RBI from
A) Proper NDE method best suited for deterioration mechanism
B) Inspection coverage
C) Inspection frequency
D) All the above
Correct Answer:
Verified
Q120: If a QRA has been prepared for
Q121: In RBI program discrimination between equipment items
Q122: No deterioration found in the inspection program
Q123: Consequence side of the risk equation is
Q124: In general, the probability of failure is
Q126: In RBI most of the probability assessment
Q127: Deterioration susceptibility and rate can be done
A)
Q128: If the material of construction and internal/external
Q129: Qualitative analysis is done and the outcome
Q130: Failure mode can primarily affects the
A) Magnitude
B)