If the probability and consequence combination (risk) is high enough to be unacceptable, then
A) A mitigation action to predict or prevent the event is recommended.
B) A mitigation action to predict or prevent the event is not recommended
C) Warrant to analyze risks involved
Correct Answer:
Verified
Q112: Risk presented in qualitative risk analysis as
A)
Q113: Results from quantitative analysis logic models are
Q114: _deals with total risk than with risk
Q115: _ refers to a prescriptive methodology that
Q116: The suitability and current condition of the
Q118: Probability of failure analysis is made from
A)
Q119: In the event of a leak the
Q120: If a QRA has been prepared for
Q121: In RBI program discrimination between equipment items
Q122: No deterioration found in the inspection program
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents