A Gantt chart is a basic scheduling tool that works best for high-volume systems.
Free
True False
Answer:

Answer:

False

Tags
Choose question tag
close menu
arrow
Flow-shop scheduling is used in high-volume systems.
Free
True False
Answer:

Answer:

True

Tags
Choose question tag
close menu
arrow
Splitting a large lot after one operation beyond a bottleneck operation would reduce the overall waiting time of the bottleneck operation.
Free
True False
Answer:

Answer:

False

Tags
Choose question tag
close menu
arrow
The output of the system cannot exceed the output of the bottleneck operation(s).
True False
Answer:
Tags
Choose question tag
close menu
arrow
The quantity sent to a bottleneck operation could be split into two or more process batches to better utilize a bottleneck resource rather than process the entire batch.
True False
Answer:
Tags
Choose question tag
close menu
arrow
When orders exceed our capacity, priority rules are used to select which orders will be accepted.
True False
Answer:
Tags
Choose question tag
close menu
arrow
The term loading, as used in scheduling, refers to choosing the order in which jobs will be processed in low-volume systems.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A schedule chart can be used to monitor job progress.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Line balancing is a major factor in the design and scheduling of low-volume systems because of batch processing.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Infinite loading and finite loading are two major approaches used to load work centers.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Loading is the determination of which work centers should perform which jobs.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Sequencing is concerned with the order in which jobs are done, while loading is concerned with assigning jobs to work centers or workstations.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Scheduling in intermediate-volume systems has three basic issues: run size, timing, and sequence.
True False
Answer:
Tags
Choose question tag
close menu
arrow
As long as the bottleneck operations are used effectively, idle time in non-bottleneck operations will not affect the overall productivity of the system.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A Gantt chart is a basic scheduling tool that is most useful in low-volume systems.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Input/output (I/O)control refers to monitoring the productivity changes since productivity is determined by the ratio of output to input.
True False
Answer:
Tags
Choose question tag
close menu
arrow
The assignment model seeks an optimum matching of tasks and resources.
True False
Answer:
Tags
Choose question tag
close menu
arrow
The elimination of idle time on both bottleneck and non-bottleneck operations must be accomplished to optimize output.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A schedule chart depicts the loading and idle times for a group of machines or departments.
True False
Answer:
Tags
Choose question tag
close menu
arrow
When operations are often bottlenecked, additional planned idle time will improve the throughput in those areas.
True False
Answer:
Tags
Choose question tag
close menu