Which of the following is the last step in the production planning hierarchy before actual output is produced?
A) Material requirements planning.
B) Enterprise resource planning.
C) Capacity planning.
D) Aggregate planning.
E) Scheduling.
Correct Answer:
Verified
Q49: Assigning jobs to work centres and to
Q50: Which of the following is not a
Q51: Job scheduling pertains to:
A)hiring workers.
B)capacity planning.
C)buying machinery.
D)timing
Q52: Scheduling that starts with the present time
Q53: In the drum-buffer-rope conceptualization used in the
Q55: Assigning jobs to work centres without regard
Q56: Finite loading,as compared to infinite loading,assumes that:
A)there
Q57: The purpose of a Gantt chart is
Q58: As a performance measure in scheduling,job flow
Q59: Monitoring and managing the work flow at
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents