Monitoring and managing the work flow at each work centre on the shop-floor of a production facility is called:
A) lot sizing.
B) inventory turnover.
C) daily dispatch lists.
D) Gantt chart.
E) Input/output (I/O) control.
Correct Answer:
Verified
Q54: Which of the following is the last
Q55: Assigning jobs to work centres without regard
Q56: Finite loading,as compared to infinite loading,assumes that:
A)there
Q57: The purpose of a Gantt chart is
Q58: As a performance measure in scheduling,job flow
Q60: A schedule/control Gantt chart is a visual
Q61: A scheduling rule used for sequencing jobs
Q62: For the jobs listed below,which processing sequence
Q63: What is the optimum job sequence for
Q64: Shift scheduling for services does not involve:
A)forecasting
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents