Finite loading,as compared to infinite loading,assumes that:
A) there are a finite number of jobs to be done.
B) work centres can be loaded without regard to their capacity.
C) work centres' capacity must be taken into account in assigning jobs.
D) work centres' capacity will be increased as needed after assigning jobs.
E) only certain jobs will be loaded based on processing time.
Correct Answer:
Verified
Q51: Job scheduling pertains to:
A)hiring workers.
B)capacity planning.
C)buying machinery.
D)timing
Q52: Scheduling that starts with the present time
Q53: In the drum-buffer-rope conceptualization used in the
Q54: Which of the following is the last
Q55: Assigning jobs to work centres without regard
Q57: The purpose of a Gantt chart is
Q58: As a performance measure in scheduling,job flow
Q59: Monitoring and managing the work flow at
Q60: A schedule/control Gantt chart is a visual
Q61: A scheduling rule used for sequencing jobs
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents