As a performance measure in scheduling,job flow time does not include:
A) movement time between operations.
B) processing time.
C) idle time.
D) setup time.
E) due dates for each job.
Correct Answer:
Verified
Q53: In the drum-buffer-rope conceptualization used in the
Q54: Which of the following is the last
Q55: Assigning jobs to work centres without regard
Q56: Finite loading,as compared to infinite loading,assumes that:
A)there
Q57: The purpose of a Gantt chart is
Q59: Monitoring and managing the work flow at
Q60: A schedule/control Gantt chart is a visual
Q61: A scheduling rule used for sequencing jobs
Q62: For the jobs listed below,which processing sequence
Q63: What is the optimum job sequence for