Which of the following is not a "tool" (technique) for shop-floor control?
A) Anticipated delay report
B) Input/output (I/O) control
C) Daily dispatch lists
D) Product structure tree
E) Schedule/control Gantt chart
Correct Answer:
Verified
Q45: In the drum-buffer-rope conceptualization used in the
Q46: Two different approaches to load work centres
Q47: The priority rule where jobs are processed
Q48: Input/Output (I/O)control is used to:
A)increase work flows
Q49: Assigning jobs to work centres and to
Q51: Job scheduling pertains to:
A)hiring workers.
B)capacity planning.
C)buying machinery.
D)timing
Q52: Scheduling that starts with the present time
Q53: In the drum-buffer-rope conceptualization used in the
Q54: Which of the following is the last
Q55: Assigning jobs to work centres without regard
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents