Six Sigma processes


A) are based on three principles: (1) all work is a statistically controllable process; (2) no well-controlled process allows variability; and (3) defect-free work requires tight statistical controls.
B) can be used for both improving existing business processes and for developing new processes or products.
C) can be used for improving products or business processes but not for developing new products or new processes.
D) consists of a disciplined, statistics-based system aimed at producing not more than 10 defects per million iterations for a manufacturing or assembly process.
E) can be used for developing new products or new business processes but not for improving existing products or business processes.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents