MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
Free
True False
Answer:

Answer:

True

Tags
Choose question tag
close menu
arrow
MRP is most valuable where a number of products are made in batches using the same productive equipment.
Free
True False
Answer:

Answer:

True

Tags
Choose question tag
close menu
arrow
The master production schedule states the number of items to be produced during specific time periods.
Free
True False
Answer:

Answer:

True

Tags
Choose question tag
close menu
arrow
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
True False
Answer:
Tags
Choose question tag
close menu
arrow
An input to the material requirements planning (MRP) system is an inventory records file.
True False
Answer:
Tags
Choose question tag
close menu
arrow
MRP is based on dependent demand.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
True False
Answer:
Tags
Choose question tag
close menu
arrow
An input to the material requirements planning (MRP) system is an exception report.
True False
Answer:
Tags
Choose question tag
close menu
arrow
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
True False
Answer:
Tags
Choose question tag
close menu
arrow
An output of MRP is a bill of materials (BOM) file.
True False
Answer:
Tags
Choose question tag
close menu
arrow
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A modular bill of materials includes items with fractional options.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
True False
Answer:
Tags
Choose question tag
close menu
arrow
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
True False
Answer:
Tags
Choose question tag
close menu
arrow
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become more "lumpy."
True False
Answer:
Tags
Choose question tag
close menu
arrow
MRP stands for material requirements planning.
True False
Answer:
Tags
Choose question tag
close menu
arrow
A master production schedule is an input to a material requirements planning (MRP) system.
True False
Answer:
Tags
Choose question tag
close menu
arrow
MRP stands for manufacturing requirements planning.
True False
Answer:
Tags
Choose question tag
close menu
arrow
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
True False
Answer:
Tags
Choose question tag