A sequence of activities defined by the project network logic is a(n) :
A) event.
B) path.
C) node.
D) route.
Correct Answer:
Verified
Q24: The variance of an activity is given
Q32: Serial activities are those that:
A)flow from one
Q33: The amount of time an activity may
Q34: These can be located by doing a
Q35: The least amount of float is found:
A)in
Q36: Prior to creating a network,it is important
Q38: _ activities can be used as summaries
Q39: There is no slack on the project
Q40: One of the defining points of a
Q42: An activity has a pessimistic time that