These can be located by doing a backward pass through a network.
A) critical paths
B) merge activities
C) successors
D) burst activities
Correct Answer:
Verified
Q29: _ activities have two or more immediate
Q30: Because an activity's pessimistic estimate may represent
Q31: Thanks to excessive dilly dallying,the subcontractor grossly
Q32: Serial activities are those that:
A)flow from one
Q33: The amount of time an activity may
Q35: The least amount of float is found:
A)in
Q36: Prior to creating a network,it is important
Q37: A sequence of activities defined by the
Q38: _ activities can be used as summaries
Q39: There is no slack on the project