Period lot-sizing procedures combine the requirements from multiple time periods,such as days or weeks,into one lot.
Correct Answer:
Verified
Q85: In a scenario when the need for
Q86: A BOM always identifies the components needed
Q87: Planning with final assembly takes into consideration
Q88: Typically,semifinished goods and raw materials have dependent
Q89: MRP type specifies the production control technique
Q91: A BOM is used only in the
Q92: In time-phased planning,materials are ordered when the
Q93: Consumption-based planning calculates the requirements for a
Q94: Consumption-based planning assumes that future consumption will
Q95: For externally procured materials,the planned delivery time
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents