In time-phased planning,materials are ordered when the stock level reaches a predetermined level known as the reorder point.
Correct Answer:
Verified
Q87: Planning with final assembly takes into consideration
Q88: Typically,semifinished goods and raw materials have dependent
Q89: MRP type specifies the production control technique
Q90: Period lot-sizing procedures combine the requirements from
Q91: A BOM is used only in the
Q93: Consumption-based planning calculates the requirements for a
Q94: Consumption-based planning assumes that future consumption will
Q95: For externally procured materials,the planned delivery time
Q96: Consumption-based planning derives dependent demand based on
Q97: MPS is a mandatory step in the