A BOM always identifies the components needed to make one unit of the finished product.
Correct Answer:
Verified
Q81: In make-to-stock strategy the production of the
Q82: Lot size dependent times remain the same
Q83: The BOM selection method in the material
Q84: The strategy group defines the strategy the
Q85: In a scenario when the need for
Q87: Planning with final assembly takes into consideration
Q88: Typically,semifinished goods and raw materials have dependent
Q89: MRP type specifies the production control technique
Q90: Period lot-sizing procedures combine the requirements from
Q91: A BOM is used only in the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents