-Use the network diagram and activity lengths in the nodes to determine the slack time for activity D.
A) 3
B) 2
C) 1
D) 0
Correct Answer:
Verified
Q85: One approach to reducing project length would
Q86: The PERT technique assumes that durations are
Q87: Float is always measured in exactly the
Q88: A gentleman farmer maniacally works on
Q88: Negative float exists when a project's critical
Q89: What is the float start time
Q90: Use the information in the table to
Q91: Use the values in the table
Q96: Use the values in the table to
Q97: An MBA student laboriously calculated the early