An assumption of three-activity-time CPM analysis is that the activity time estimates conform to the beta distribution.Which of the following is a valid criticism of this assumption?
A) Project activities cannot always be networked
B) Project control doesn't focus enough on the critical path
C) Obtaining three valid time estimates to put into the formula is difficult
D) Beta distributions do not occur naturally
E) None of the above
Correct Answer:
Verified
Q63: In CPM analysis, it is generally expected
Q76: You have determined the critical path in
Q77: If you have an optimistic time of
Q78: For an activity in a Single Time
Q79: A company must perform a maintenance
Q80: If the pessimistic duration of an activity
Q82: Below are the data for a Time-Cost
Q84: Which of the following is an assumption
Q85: Below are the data for a
Q86: If the pessimistic duration of an activity
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents