
Consider the following work breakdown structure:
What is the estimated slack time for activity D?
A) 0 days
B) 19 days
C) 20 days
D) 79 days
E) 80 days
Correct Answer:
Verified
Q81: Consider the following work breakdown structure:
Q82: A project is represented by the following
Q83: Consider the following work breakdown structure:
Q84: Consider the following work breakdown structure:
Q85: Consider the following work breakdown structure:
Q87: Consider the following work breakdown structure:
Q88: A project is represented by the following
Q89: Consider the following work breakdown structure:
Q90: Consider the following work breakdown structure:
Q91: Consider the following work breakdown structure:
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents