A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. They wish to produce 600 units per day, working two 8-hour shifts.
a. Draw a network diagram of precedence relationships.
b. Compute the required cycle time per unit in seconds.
c. Compute the minimum number of workstations required to produce 600 units per day.
d. Balance this line using longest processing time.
e. What is the efficiency of the line obtained in part d?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q92: A work cell is scheduled to build
Q140: Define the following terms that occur in
Q141: You have been asked to balance
Q142: An insurance claims processing center has
Q143: A company is designing a product
Q143: An assembly line with 11 tasks is
Q146: Brandon's computer shop has hired a consultant
Q148: There are three work centers (A,
Q149: An airport is trying to balance
Q150: An electronics manufacturer makes remote control
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents