Which of the following descriptions best defines the materials quantity variance?
A) The difference between the static budget cost of materials used and the actual cost of materials
B) The difference between the actual cost of materials and the flexible budget cost of materials
C) The difference between the standard cost of actual materials used and the flexible budget cost for materials
D) The variation in number of units produced and available capacity
Correct Answer:
Verified
Q23: By using time and motion studies, it
Q24: Assume that the standard cost to make
Q25: Assume that the standard cost to make
Q26: The difference between an actual cost number
Q27: The objective of standard cost variance analysis
Q29: Which of these factors is not a
Q30: Which of the following factors describes a
Q31: Which factor listed below is a cause
Q32: Which factor listed below is a possible
Q33: If the actual labor rate exceeds the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents