_____________is required for preliminary studies of various aspects of a work or project.
A) supplementary estimate
B) plinth area estimate
C) revised estimate
D) abstract estimate
Correct Answer:
Verified
Q2: Per kilometre basis depending on the nature
Q3: Approx. cost of a bridge of 3
Q4: Approximate cost of sewerage project for a
Q5: _is prepared on the basis of plinth
Q6: _ is the amount provided in the estimate
Q7: _estimate is a detailed estimate and is
Q8: A large work or project may consists
Q9: The term _is used to denote a
Q10: The surface of the highway pavement should
Q11: The soil becomes weak in _
A)summer
B)winter
C)rainy season
D)spring