___________estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.
A) supplementary and revised estimate
B) maintenance estimate
C) item rate estimate
D) revised estimate
Correct Answer:
Verified
Q2: Per kilometre basis depending on the nature
Q3: Approx. cost of a bridge of 3
Q4: Approximate cost of sewerage project for a
Q5: _is prepared on the basis of plinth
Q6: _ is the amount provided in the estimate
Q8: A large work or project may consists
Q9: The term _is used to denote a
Q10: The surface of the highway pavement should
Q11: The soil becomes weak in _
A)summer
B)winter
C)rainy season
D)spring
Q12: Which of the following pavement has greater