Changeover time is a critical lean measure in processing plants and manufacturing environments. SMED (Single-Minute Exchange of Dies) is a system for reducing the time it takes to complete equipment changeovers. Which of the following is NOT one of the benefits of SMED?
A) Larger lot sizes with faster changeovers.
B) Lower inventory levels.
C) Improved response to customer demand.
D) Lower manufacturing costs.
Correct Answer:
Verified
Q36: A Six Sigma Greenbelt is calculating key
Q37: Queue times are important lean measures in
Q38: A hospital is trying to improve patient
Q39: Which key lean measure for "delays" would
Q40: The performance factor for Overall Equipment Effectiveness
Q42: Lean measures which have financial impact are
Q43: Typical measures for cash flow include Net
Q44: Customer satisfaction is the main goal of
Q45: The Role of Performance Measurement is to
Q46: Strategic lean metrics include return on capital,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents