Queue times are important lean measures in processing times. There are five elements of the cycle time of a process: run time, queue time, move time, wait time, and setup time. Of these choices, which one is the only value-added time?
A) Queue time of a process.
B) Setup time of a process.
C) Move time of a process.
D) Run time of a process.
Correct Answer:
Verified
Q32: Takt time is a measure which calculates
Q33: Cycle time is a key lean measurement
Q34: Lead time is the total time required
Q35: Which of the following lean cost metrics
Q36: A Six Sigma Greenbelt is calculating key
Q38: A hospital is trying to improve patient
Q39: Which key lean measure for "delays" would
Q40: The performance factor for Overall Equipment Effectiveness
Q41: Changeover time is a critical lean measure
Q42: Lean measures which have financial impact are
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents