The Following Questions Adapted from Tutorial Material of H Steyn

Question 28

Short Answer

The Following Questions adapted from tutorial material of H Steyn Ed., Project Management -A Multi-disciplinary Approach (Pretoria: FPM Publishing, 2003). Reprinted with permission.
-Put checks in the appropriate boxes in the table below.
 Project  buffer  Feeding  buffer  Resource  buffer  Drum  buffer  This buffer/ these buffers ensure(s) that, unlike  the critical path, the critical chain does not  change from time to time during project  execution.  This buffer/ these buffers ensure(s) that jobs  done faster than planned contribute to reduced  project duration.  Action is required when this/these buffer(s)  is/are say 67% depleted.  This/these buffer(s) contain a contingency  reserve that has been removed from activities.  If activities are done faster than planned, it  could cause that this/these buffer(s) could get  depleted (i.e. get smaller).  This/these buffer(s) is/are never used on a  single project. \begin{array} { | l | l | l | l | l | } \hline & \begin{array} { l } \text { Project } \\\text { buffer }\end{array} & \begin{array} { l } \text { Feeding } \\\text { buffer }\end{array} & \begin{array} { l } \text { Resource } \\\text { buffer }\end{array} & \begin{array} { l } \text { Drum } \\\text { buffer }\end{array} \\\hline \begin{array} { l } \text { This buffer/ these buffers ensure(s) that, unlike } \\\text { the critical path, the critical chain does not } \\\text { change from time to time during project } \\\text { execution. }\end{array} & & & & \\\hline \begin{array} { l } \text { This buffer/ these buffers ensure(s) that jobs } \\\text { done faster than planned contribute to reduced } \\\text { project duration. }\end{array} & & & & \\\hline \begin{array} { l } \text { Action is required when this/these buffer(s) } \\\text { is/are say 67\% depleted. }\end{array} & & & & \\\hline \begin{array} { l } \text { This/these buffer(s) contain a contingency } \\\text { reserve that has been removed from activities. }\end{array} & & & & \\\hline \begin{array} { l } \text { If activities are done faster than planned, it } \\\text { could cause that this/these buffer(s) could get } \\\text { depleted (i.e. get smaller). }\end{array} & & & & \\\hline \begin{array} { l } \text { This/these buffer(s) is/are never used on a } \\\text { single project. }\end{array} & & & & \\\hline\end{array}

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents