The need for a multitude of calculations of form materials prices can be entirely avoided by using a(n) "____" for all form materials required on a project.
A) budget price
B) trade price
C) reference price
D) average price
Correct Answer:
Verified
Q4: The most time-consuming activity involved in setting
Q5: Buggies require a small number of personnel
Q6: Concrete cannot be placed using the crane
Q7: The "_" is the area of the
Q8: Most contractors tend to use the same
Q10: Reinforcing steel for concrete includes _ and
Q11: Form hardware is often computed at a
Q12: The factor that, perhaps, has the most
Q13: _ for cast-in-place concrete may be constructed
Q14: _ additives to concrete are used to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents