The most time-consuming activity involved in setting up a form system is usually the placing and adjusting of ____.
A) form ties
B) form walls
C) rebar
D) form marks
Correct Answer:
Verified
Q1: Where a central tower crane is not
Q2: The most economical method of placing concrete
Q3: The cost of supplying concrete to a
Q5: Buggies require a small number of personnel
Q6: Concrete cannot be placed using the crane
Q7: The "_" is the area of the
Q8: Most contractors tend to use the same
Q9: The need for a multitude of calculations
Q10: Reinforcing steel for concrete includes _ and
Q11: Form hardware is often computed at a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents