The "____" is the area of the form system that will be in contact with the concrete.
A) load area
B) contact area
C) support area
D) form area
Correct Answer:
Verified
Q2: The most economical method of placing concrete
Q3: The cost of supplying concrete to a
Q4: The most time-consuming activity involved in setting
Q5: Buggies require a small number of personnel
Q6: Concrete cannot be placed using the crane
Q8: Most contractors tend to use the same
Q9: The need for a multitude of calculations
Q10: Reinforcing steel for concrete includes _ and
Q11: Form hardware is often computed at a
Q12: The factor that, perhaps, has the most