The total cost for each time unit of a project is the sum of labor, materials, and equipment.
Correct Answer:
Verified
Q10: The higher the cost slope of an
Q11: Crashing frequently results in over allocation of
Q12: Because direct costs are assumed to be
Q13: If indirect costs are a significant percentage
Q14: Shortening an activity's duration is termed crashing.
Q16: Crashing a more expensive activity may be
Q17: Direct costs are so named because they
Q18: When crashing an activity, you always crash
Q19: There are more options available for reducing
Q20: Incentive contracts can make the reduction of