The following information is to be used in this and the next question. For the last week a work center had a planned input of 40 standard hours and an actual input of 36 standard hours. The planned output was 40, the actual output 42 standard hours and the beginning backlog was 30 hours. The cumulative input variance was:
A) 0
B) -2
C) +2
D) -4
E) +4
Correct Answer:
Verified
Q25: Given the following information, which sequence
Q26: The planned backlog was:
A) 30
B) 36
C) 40
D)
Q27: The selection and sequencing of available jobs
Q28: In a drum-buffer-rope scheduling system, the "drum"
Q29: If today is manufacturing day 100 and
Q30: Which of the following is concerned with
Q31: Operation splitting means:
A) the same job running
Q33: A scheduling system that assumes the required
Q34: Which of the following is NOT a
Q35: Operation overlapping means:
A) using alternate routings
B) moving
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents