ABC project organization has one workstation that is capable of generating the drawings that their clients study before accepting ABC's bid.ABC is currently in the midst of three proposal projects and knows which proposed project will be most profitable and which will be least profitable.The workstation is scheduled so that the most profitable project's work is done first and the least profitable project work is done last.This is an example of:
A) identifying a constraint.
B) exploiting a constraint.
C) elevating a constraint.
D) subordinating a system.
Correct Answer:
Verified
Q27: The _ Theorem states that if a
Q28: CCPM advocates modification of the project schedule
Q29: Project personnel often become involved in several
Q30: Keith welds a one-fourth-inch diameter ball bearing
Q31: Critical Chain Project Methodology _ risk for
Q33: The best thing a project manager can
Q34: Which of the following is an example
Q35: Which of the following is an example
Q36: The first step in TOC methodology is
Q37: CCPM advocates putting off non-critical activities as
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents