A Methods and Measurements Analyst needs to develop a time standard for a certain task.In a preliminary study,he observed one of his employees perform this task five times,with the following results: What is the observed time (OT) for this task?
A) 80 seconds
B) 84 seconds
C) 160 seconds
D) 240 seconds
E) 400 seconds
Correct Answer:
Verified
Q101: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q102: The owner of Kat Motel wants to
Q103: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q104: A Methods and Measurements Analyst needs to
Q105: A Methods and Measurement Analyst wants to
Q107: A Methods and Measurements Analyst needs to
Q108: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q109: A Methods and Measurement Analyst wants to
Q110: The owner of Kat Motel wants to
Q111: Which of the following plans is based
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents