Five jobs are waiting for processing through two work centres.Their processing time (in minutes) at each work centre is contained in the table below.Each job requires work centre Alpha before work centre Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs?
A) V-T-S-U-R;225
B) U-R-T-S-V;175
C) R-S-T-U-V;240
D) U-S-V-T-R;200
E) V-U-T-S-R;250
Correct Answer:
Verified
Q63: Which of the following dispatching rules is
Q64: Sequencing (or dispatching)
A) assigns dates to specific
Q66: Eight jobs have been sequenced at a
Q69: Which of the following is an advantage
Q72: When a set of jobs must pass
Q76: Five jobs are waiting for processing through
Q78: Five jobs are waiting to be processed.Their
Q78: Flow time represents the time
A) an order
Q97: Which of the following statements regarding finite
Q120: _ uses computerized short-term scheduling to overcome
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents