You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.
a.Draw the precedence diagram.
b.Determine the desired cycle time.
c.Determine the theoretical minimum number of stations needed.
d.Balance this line using most following tasks.
e.What is the efficiency of the line obtained in part d?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q143: An assembly line with 11 tasks is
Q149: The flow and distance data in the
Q150: Cyclone Appliances has developed a new European-style
Q151: A facility is trying to set up
Q155: Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces
Q156: A work cell is scheduled to build
Q156: There are three work centers (A,B,and C)behind
Q158: A company is trying to balance production
Q158: An insurance claims processing center has six
Q159: A firm operates a flow shop building
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents