Three jobs are to be assigned to three machines.Cost for each job-machine combination appears in the table below.Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column;then cover with straight lines) .At this point in the problem-solving process
A) the row for Job 1 contains the values 5,6,and 0.
B) calculations are complete,and the problem is ready for an optimal set of assignments.
C) the column for Machine B indicates that it should be retired.
D) Job 1 should be performed on Machine B.
E) Job 1 should be performed on Machine A.
Correct Answer:
Verified
Q27: If job 5 takes 3,4 or 5
Q41: The production database containing information about each
Q48: If an assignment problem consists of 5
Q49: Which of the following files tracks work
Q51: A scheduling technique used to achieve optimum,
Q59: Which of the following is an aid
Q61: Conventional MRP uses time buckets that do
Q63: Five jobs are waiting for processing through
Q64: Sequencing (or dispatching)
A) assigns dates to specific
Q64: Five jobs are waiting for processing through
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents