Conventional MRP uses time buckets that do not recognize capacity limits, and in fact ignores capacity issues. A more realistic scheduling system that includes work centre capacities and other resource availabilities is
A) aggregate planning.
B) the master production schedule.
C) finite capacity scheduling.
D) the assignment method.
E) level material use.
Correct Answer:
Verified
Q49: There are two jobs to be assigned
Q50: Which of the following dispatching rules ordinarily
Q56: A work centre had actual input of
Q59: Which of the following is an aid
Q60: A method of input-output control that uses
Q64: Sequencing (or dispatching)
A) assigns dates to specific
Q66: Which of the following are limitations of
Q66: Eight jobs have been sequenced at a
Q69: Which of the following dispatching rules tends
Q75: The most appropriate sequencing rule to use
Unlock this Answer For Free Now!