Whoever is responsible for the control of the denominator activity in the predetermined overhead rate should also be responsible for the variable overhead efficiency variance.
Correct Answer:
Verified
Q10: The variable overhead efficiency variance measures how
Q11: The production manager is usually held responsible
Q12: In standard costing, the standard quantity allowed
Q13: All cost variances should be considered exceptions
Q15: The materials price variance should be computed:
A)
Q16: The materials quantity variance is computed based
Q17: From a standpoint of cost control, the
Q18: In standard costing, practical standards can be
Q19: Quantity standards indicate how much of an
Q26: An unfavorable materials quantity variance indicates that: