Two factories produce three different types of kitchen appliances. The following table summarizes the production capacities, the numbers of each type of appliance ordered, and the daily operating costs for the factories. How many days should each factory operate to fill the orders at minimum cost? Find the minimum cost.
A) Minimum cost of $245,000 using 20 days at Factory 1 and 0 days at Factory 2.
B) Minimum cost of $612,500 using 50 days at Factory 1 and 0 days at Factory 2.
C) Minimum cost of $1,002,500 using 10 days at Factory 1 and 40 days at Factory 2.
D) Minimum cost of $807,500 using 30 days at Factory 1 and 20 days at Factory 2.
E) Minimum cost of $465,500 using 38 days at Factory 1 and 0 days at Factory 2.
Correct Answer:
Verified
Q76: Solve both the primal and dual problems
Q77: Suppose a primal minimization problem and its
Q78: Form the matrix associated with the given
Q79: Write the dual maximization problem. Be sure
Q80: Solve the following minimization problem by solving
Q82: Three factories each dump waste water containing
Q83: A primal maximization problem is given. Solve
Q84: Write the dual maximization problem.
Minimize
Q95: CDF Appliances has assembly plants in Atlanta
Q100: Nekita Corporation assembles cell phones and camera
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents