The St. Augustine Corporation originally budgeted for $360,000 of fixed overhead at 100% production capacity. Production was budgeted to be 12,000 units. The standard hours for production were 5 hours per unit. The variable overhead rate was $3 per hour. Actual fixed overhead was $360,000 and actual variable overhead was $170,000. Actual production was 11,700 units. Compute the factory overhead controllable variance.
A) $9,000F
B) $9,000U
C) $5,500F
D) $5,500U
Correct Answer:
Verified
Q98: Which of the following is not a
Q99: The following data relate to direct labor
Q100: The formula to compute direct labor time
Q101: The standard factory overhead rate is $7.50
Q102: Assuming that the standard fixed overhead rate
Q104: The standard costs and actual costs for
Q106: The following data is given for the
Q107: The following data is given for the
Q108: The standard costs and actual costs for
Q120: Incurring actual indirect factory wages in excess
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents