Why might labour costs be reduced in a value stream system?
A) The reduction causes an elimination of the need for any specialized skilled employees such as industrial engineers or production schedulers.
B) The labour costs of industrial engineers and production schedulers can be pooled and allocated to the value streams.
C) Some of the workers can be cross-trained to perform value-added activities within the value stream.
D) Typically,implementing value stream results in layoffs of many workers.
Correct Answer:
Verified
Q30: What is the usual formula for calculating
Q31: Which of the following is considered a
Q32: Which of the following is considered a
Q33: Why is units shipped instead of units
Q34: How is overproduction of good controlled in
Q36: How is production triggered in a demand-pull
Q37: The following information relates to Ramesy
Q38: Which of the following is characteristic of
Q39: Which of the following is an advantage
Q40: The following information relates to Ramesy
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents