The following information relates to Ramesy Manufacturing:
To produce a unit of product
There is a wait time of 5 minutes before the Cutting Department begins a batch, 15 minutes between the Cutting and Welding departments, a move and pre-wait between Welding and Polishing of 12 minutes, and a move and pre-wait between the Polishing and Finishing departments of 8 minutes.
-Refer to the figure.What is the cycle time of operation?
A) 16 minutes
B) 20 minutes
C) 35 minutes
D) 60 minutes
Correct Answer:
Verified