Using the Security Market Line concept in capital budgeting,which of the following statements is CORRECT?
A) If the expected rate of return on a given capital project lies above the SML, the project should be accepted even if its beta is greater than the beta of the firm's average project.
B) If a project's return lies below the SML, it should be rejected if it has a beta greater than the firm's existing beta but accepted if its beta is below the firm's beta.
C) If two mutually exclusive projects' expected returns are both above the SML, the project with the lower risk should be accepted.
D) If a project's expected rate of return is greater than the expected rate of return on an average project, it should be accepted.
E) None of the statements is correct.
Correct Answer:
Verified
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents