Which of these estimates should be the most accurate?
A) Parametric
B) Definitive
C) Comparative
D) Order of magnitude
Correct Answer:
Verified
Q26: Explain the difference between normal and expedited
Q27: A project manager is estimating costs on
Q28: Rank the four different types of cost
Q29: Effective comparative estimates rely most heavily on:
A)An
Q30: An order of magnitude estimate is usually
Q32: If a project manager is using a
Q33: Cost estimates that are based as a
Q34: Once most of the design work is
Q35: When their baby was ready to head
Q36: Analogous estimation is a type of _