_____ create bottlenecks that cause disruptive backups of WIP to form.Such events can be costly.
A) Pull-type production systems
B) Push-type production systems
C) Work overload production systems
D) none of the above
Correct Answer:
Verified
Q58: The overriding objective of line-balancing is
A)to split
Q59: Cycle times of inbound and outbound supplies
Q60: Strategic thinking should include time-based and cycle-time
Q61: Which of the following is the first
Q62: Which of the following heuristics sets the
Q64: _ line-balancing methods employ "rule of thumb,"
Q65: Which of the following is a percentage
Q66: Among the varying set of heuristics,which of
Q67: _ is a transporter,usually a belt,that moves
Q68: The Kilbridge and Wester heuristic assigns a