The first step in the planning hierarchy is _____ planning.
A) production
B) capacity
C) MRP
D) DRP
Correct Answer:
Verified
Q67: What information system would require current data
Q68: Closed-loop MRP consists of
A)production planning.
B)master production scheduling.
C)capacity
Q69: MRP record processing proceeds from one level
Q70: MRP cannot be used without the appropriate
Q71: The matrix _ is a special chart
Q73: DRP1 can be defined as
A)determining the needs
Q74: In a _ environment,there is some latitude
Q75: _ is a higher order planning system
Q76: _ uses the principle that the lowest
Q77: _ are the starting point for actual