MRP cannot be used without the appropriate set of
A) BOMs.
B) MTSs.
C) MTOs.
D) ATOs.
Correct Answer:
Verified
Q65: _ is the essence of supply chain
Q66: In a _ model the idea is
Q67: What information system would require current data
Q68: Closed-loop MRP consists of
A)production planning.
B)master production scheduling.
C)capacity
Q69: MRP record processing proceeds from one level
Q71: The matrix _ is a special chart
Q72: The first step in the planning hierarchy
Q73: DRP1 can be defined as
A)determining the needs
Q74: In a _ environment,there is some latitude
Q75: _ is a higher order planning system
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents